Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13755317

- Product Categories
- Friendly Links
Information Name: | Driving corrosion corrosion engineering, Jiangsu Driving |
Published: | 2015-05-05 |
Validity: | 30 |
Specifications: | 1 |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Jiangsu Driving corrosion engineering / Hunan driving a preservative project, driving embalmed and requirements (1) with a fine sandpaper old alkyd red lead paint, and remove any residual dross rust and wear parts; (2) grinding is completed After thorough cleaning and sanding dust debris. (3) prior to coating application, shall be subject to the grass-roots Party organizations such Supervisor acceptance, make sure to remove all oil, dust, grease, dirt, rust and other external attachments only after formal coating application to ensure coating equipment quality and service life. (4) should be checked before each coating on a substrate or finishes on whether there is oil, dust, grease, dirt or other external attachments. (5) Before priming a first pre-coat primer coating difficult position in the corners, weld seams and polished parts of rust, etc., to ensure that parts of the film thickness to meet the requirements 2 Construction environmental requirements (1) Temperature: Minimum 4oC, the highest 35oC, at least 3oc above dew point Relative humidity: up to 85% (2) or three or more windy rainy day, do not allow the construction. After construction not rain within 8 hours (note the weather forecast, reasonable arrangements period), after the rain 1 to 2 days before being subject to the base construction and dried again. Driving corrosion construction specifications: 1. "Painting technical term" (GB8264-1987) 2. "atmospheric corrosivity classification" (GB / 15957-1995) 3. "film thickness measurement method" (GB1764) 4. "Building anticorrosion construction and acceptance "(GB 50212━2002) 5." construction site temporary electrical safety specifications "(JGJ46-88) 6." height of construction work safety technical specifications "(JGJ80-91) 7. "Construction machinery use safety technology" (JGJ33-2001) 8. "Construction steel tubular scaffolding safety specifications" (JGJ130-2001) 9. "construction safety inspection standards" (JGJ59-9 this project should be implemented in addition to above standards and norms, the corresponding line with current national Alegre Jiangsu three high-altitude anti-corrosion Co. 1 ||| Jiangsu road preservation projects / Hunan Driving preservative project |
Admin>>>
You are the 7665 visitor
Copyright © GuangDong ICP No. 10089450, Jiangsu three Alegre, high-altitude anti-corrosion Co., Ltd. 1 All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7665 visitor
Copyright © GuangDong ICP No. 10089450, Jiangsu three Alegre, high-altitude anti-corrosion Co., Ltd. 1 All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility